Dilshanta Public School

A two-storey school block built alongside the running school — classrooms, an open corridor on both levels and external steel stairs, put up while term carried on next door.

Location
Kathmandu
Completed
2026
Status
Handed over
Scope of works

What this contract covered.

Discuss a similar job
  1. 01

    Steel framed structure and roofing

  2. 02

    Classroom block over two levels

  3. 03

    External steel stair and corridor railings

  4. 04

    Finishing, painting and site works

On site

3 images from this job.

Completed two-storey school block painted blue with an open corridor on both levels and an external steel staircase
The finished block — classrooms over two levels with an open corridor and external stair.
Steel frame of the school block being erected with a concrete mixer running and workers on the structure, school playground beside it
Frame going up beside the running school. Mixing on site, with the playground a few metres away.
Block masonry walls rising under the completed steel roof structure of the school, bamboo scaffold in place and the playground alongside
Walls going up under the finished roof, so the block stayed weather-tight while it was built out.
Other contracts

More of the same work.

All projects →
04/Get in touch

Planning something like this?

We will visit the site, measure it and tell you what the job actually involves before any estimate is issued. Er. Shreekrishna Budhathoki takes these calls himself.

Kageshwori Manohara-06, Kathmandu · Sunday – Friday, 8:00 AM – 6:00 PM